Building Plans

We are thrilled to share our exciting architectural vision with you. Dive into the detailed plans and renderings of our future sanctuary, where modern design meets serene landscapes. Discover how we're crafting a place of beauty and tranquility, dedicated to honoring cherished memories and providing a peaceful haven for generations to come. Join us on this journey as we build a landmark of faith and remembrance in Taytay, Rizal.

Renderings

Photos (Construction Updates)

Construction Milestones

2023
February
2023
Site Preparation

This milestone marks the beginning of the actual construction process, and includes the removal of any existing structures, grading and leveling of the site, and preparation of the foundation.

September
2023
Foundation Works

This milestone includes the pouring of concrete for the foundation and the construction of the retaining walls.

January
2024
Structural Framing

This milestone involves the erection of the main structural steel frame of the building.

March
2024
Roofing

The installation of the roofing system, including the decking, trusses, and roofing material.

April
2024
Exterior Finishing

This milestone includes the installation of exterior walls, windows, doors, and other architectural features.

June
2024
Interior Framing

This milestone includes the installation of interior walls, ceilings, and drywall.

2024
August
2024
Plumbing and Electrical Rough-In

This milestone involves the installation of the plumbing and electrical systems, including pipes, fixtures, wiring, and electrical panels.

September
2024
HVAC and Fire Protection Systems

This milestone includes the installation of heating, ventilation, and air conditioning systems, as well as fire protection systems such as sprinklers and alarms.

October
2024
Interior Finishing

This milestone involves the completion of the interior finishes, including flooring, painting, trim, and cabinetry.

2025
January
2025
Landscaping and Site Work

This milestone includes the landscaping of the grounds, the installation of sidewalks, curbs, and retaining walls, and any other site work that needs to be done.

June
2025
Final Inspections and Turnover

This milestone marks the completion of the construction, and the Church will be handed over to the PACEM for management.